In the beginning, there was the excavator........ then the forms........ then the concrete;
Tuesday - excavation
Wednesday and Thursday - forms and gravel
Friday - Concrete pumped
Monday - forms removed and clean-up
South side of our bedroom




Excavating in front of the wood window


Cutting the concrete and excavating south of the kitchen


Now the east side of the house


The porch (with the resident snake) is gone

And the kids loved it

gravel is delivered

porch rebuilt

Concrete is pumped from the truck to the pumper

Wood window


north side of house

Porch



South of bedroom


South of kitchen



And it's over. We can walk on it starting on Monday

But Holland got to stand on it first

And Warren tasted to see it the flavor was robust

We did lots of other stuff this week too
Burned more tree trimmings

Dad repaired the Gravely

kids played with new "frisbees" after school

Dad worked on repairing a split drainage pipe in the camper....luckily Malcolm knew what he was doing and had the right tools. ....and gave kids a ride on the ATV


We cleaned out one side of greenhouse #2 - before the blackberries took over


While waiting for the concrete truck to come, we practiced our gymnastic routines



We did some work up at Goodin Acres. Planted about seven evergreen trees along the fence line between the Mealue's property and the eastern part of Goodin Acres


We asked Vanessa's boys to rake up all the leaves in the front yard and put them in the trailer. Then we spread the leaves on our garden

And if that wasn't enough, we went to the last home meet of the OSU Gymnastics Team

Sunday was the birthday party for all the March babies.
Malcolm is 31 on March 22nd
Camille is 15 on March 28th
Eric is 5 on March 25th


No comments:
Post a Comment